East Energy Projects
From the initial consultation to commissioning.
This is how we implement energy projects for the future.
Our foundation: Professional expertise
meets regional roots
Our expertise, our many years of experience, and our deep understanding of local conditions form the foundation of every project development at East Energy.
We understand the language of administration, municipalities, agriculture, the public, and specialist authorities, and bring all perspectives together at an early stage.
This enables us to transform technical, legal, and social challenges into practical and accepted solutions.
From surface area to solution
Our project development includes:
-
Site identification & securing
We evaluate suitable locations based on technical, economic, nature conservation, and local political criteria—with a long-term perspective.
-
Feasibility studies & grid connection planning
We analyze technical conditions, examine grid connections, and precisely dimension generators, storage facilities, and consumption circuits.
-
Communication & participation
Whether owners, municipal representatives, or authorities: we rely on transparent communication, early involvement, and long-term cooperation.
-
Approval procedures & urban land-use planning
We manage procedures reliably and efficiently – right through to the implementation of privileged projects in accordance with Section 35 of the German Building Code (BauGB).
-
Sustainability & biodiversity
We plan beyond the minimum legal requirements and actively focus on environmental compatibility and nature enhancement (bne commitment).
Overview of urban planning procedures
Most ground-mounted PV projects require a municipal planning procedure. Here is an overview of the process:
Decision to initiate planning
Based on a project proposal, the municipality decides to initiate a development procedure.
Preliminary design phase
Preparation of initial planning documents, commissioning of environmental reports, initial involvement
of the public and authorities
Drafting phase
Consideration of feedback, preparation of the legally binding draft,
renewed public disclosure
Statutory resolution
The municipality approves the final development plan. This is announced and then becomes legally binding.
Building law & approval
Based on the statutes, the building application can be submitted and the project approved.
Privilege under Section 35 of the German Building Code (BauGB): Fast track for PV projects
PV systems on areas within a 200-meter corridor along highways and railways can be approved directly. No urban land-use planning required. This saves time and resources.

Sustainability through good planning
We are part of the bne's voluntary commitment to “Good Planning of Ground-Mounted PV Systems.”
This means:
-
Transparent cooperation with municipalities and administrations
-
Fair and long-term land use with farmers
-
Integration into the landscape and infrastructure
-
Promotion of biodiversity through targeted measures
-
Technically and ecologically optimized implementation
Insight into our project world
Visualization of our project in Klevenow
Trust through transparency
Our goal is not only technical progress, but also social acceptance.
We take the concerns of citizens, property owners, municipalities, and authorities seriously.
And we believe in honest, solution-oriented dialogue on an equal footing.